{"id":12063,"date":"2024-09-06T11:07:38","date_gmt":"2024-09-06T11:07:38","guid":{"rendered":"https:\/\/www.ativ.pt\/2024\/09\/06\/rehabilitation-of-pipelines-at-valorsul\/"},"modified":"2024-09-10T11:19:40","modified_gmt":"2024-09-10T11:19:40","slug":"rehabilitation-of-pipelines-at-valorsul","status":"publish","type":"post","link":"https:\/\/www.ativ.pt\/en\/2024\/09\/06\/rehabilitation-of-pipelines-at-valorsul\/","title":{"rendered":"Rehabilitation of Pipelines at Valorsul"},"content":{"rendered":"\n<p>The project consisted of installing a new GRP (Glass-Reinforced Polyester) pipeline with an internal diameter of 1176 mm and a thickness of 26 mm inside the existing DN1300 concrete pipes, a methodology known as <em>Sliplining<\/em>.<\/p>\n\n<p>In this type of solution, it is essential to ensure the filling of the remaining space between the concrete pipe and the new GRP pipe with a cementitious grout, in order to provide integrity to the system and protect it from undesirable movements.<\/p>\n\n<p>Given the pipeline layout with changes in direction, and considering that the <em>Sliplining<\/em> rehabilitation method does not allow the execution of curved sections, it was necessary to divide the pipelines into three straight sections, with the creation of shafts for the introduction of the new pipes.<\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"650\" height=\"487\" data-id=\"12036\" src=\"https:\/\/www.ativ.pt\/wp-content\/uploads\/2024\/09\/valosul_conduta1.jpg\" alt=\"\" class=\"wp-image-12036\" srcset=\"https:\/\/www.ativ.pt\/wp-content\/uploads\/2024\/09\/valosul_conduta1.jpg 650w, https:\/\/www.ativ.pt\/wp-content\/uploads\/2024\/09\/valosul_conduta1-300x225.jpg 300w\" sizes=\"(max-width: 650px) 100vw, 650px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"650\" height=\"487\" data-id=\"12041\" src=\"https:\/\/www.ativ.pt\/wp-content\/uploads\/2024\/09\/valosul_conduta2.jpg\" alt=\"\" class=\"wp-image-12041\" srcset=\"https:\/\/www.ativ.pt\/wp-content\/uploads\/2024\/09\/valosul_conduta2.jpg 650w, https:\/\/www.ativ.pt\/wp-content\/uploads\/2024\/09\/valosul_conduta2-300x225.jpg 300w\" sizes=\"(max-width: 650px) 100vw, 650px\" \/><\/figure>\n<\/figure>\n\n<p>The entry shafts were precisely executed to expose the existing pipe and allow the removal of the upper section of the concrete pipe, leaving the lower section in place.<\/p>\n\n<p>The major limitation of this methodology is precisely in the areas where there is a change in direction, as the lining can only be executed in straight sections, leaving a transition area and\/or change in direction that always requires a complementary solution.<\/p>\n\n<p>Thus, Mota-Engil ATIV opted for lining the transition zones with 3mm HDPE sheeting, mechanically fixed to the existing pipe and electro-welded between plates. Additionally, AMEX joints, made of EPDM rubber and a 316L stainless steel ring, were installed to reinforce the solution and ensure complete system tightness, as the pipelines operate under constant pressure of about 1.5 bar throughout 365 days\/year. In total, 630 meters of the intake pipeline were rehabilitated.  <\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"500\" height=\"666\" data-id=\"12051\" src=\"https:\/\/www.ativ.pt\/wp-content\/uploads\/2024\/09\/valosul_conduta3.jpg\" alt=\"\" class=\"wp-image-12051\" srcset=\"https:\/\/www.ativ.pt\/wp-content\/uploads\/2024\/09\/valosul_conduta3.jpg 500w, https:\/\/www.ativ.pt\/wp-content\/uploads\/2024\/09\/valosul_conduta3-225x300.jpg 225w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"666\" data-id=\"12046\" src=\"https:\/\/www.ativ.pt\/wp-content\/uploads\/2024\/09\/valosul_conduta4.jpg\" alt=\"\" class=\"wp-image-12046\" srcset=\"https:\/\/www.ativ.pt\/wp-content\/uploads\/2024\/09\/valosul_conduta4.jpg 500w, https:\/\/www.ativ.pt\/wp-content\/uploads\/2024\/09\/valosul_conduta4-225x300.jpg 225w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/figure>\n<\/figure>\n\n<p>A pioneer and reference in this field for about 20 years, for Mota-Engil ATIV, this was a major challenge as it continues to ensure the operational functionality of systems for key clients.<br\/><br\/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The rehabilitation of the S admission pipelines of the cooling water circuit at the Urban Solid Waste Treatment Plant (USWTP) of Valorsul, S.A. is one of the major projects in Mota-Engil ATIV&#8217;s portfolio.<\/p>\n","protected":false},"author":2,"featured_media":12057,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[17],"tags":[],"class_list":["post-12063","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-article"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Rehabilitation of Pipelines at Valorsul - Mota-Engil ATIV<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.ativ.pt\/en\/2024\/09\/06\/rehabilitation-of-pipelines-at-valorsul\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rehabilitation of Pipelines at Valorsul - Mota-Engil ATIV\" \/>\n<meta property=\"og:description\" content=\"The rehabilitation of the S admission pipelines of the cooling water circuit at the Urban Solid Waste Treatment Plant (USWTP) of Valorsul, S.A. is one of the major projects in Mota-Engil ATIV&#039;s portfolio.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.ativ.pt\/en\/2024\/09\/06\/rehabilitation-of-pipelines-at-valorsul\/\" \/>\n<meta property=\"og:site_name\" content=\"Mota-Engil ATIV\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/MotaEngilATIV\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-09-06T11:07:38+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-09-10T11:19:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.ativ.pt\/wp-content\/uploads\/2024\/09\/valosul_conduta_destaque.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1198\" \/>\n\t<meta property=\"og:image:height\" content=\"470\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Susana Guerreiro\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Susana Guerreiro\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/2024\\\/09\\\/06\\\/rehabilitation-of-pipelines-at-valorsul\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/2024\\\/09\\\/06\\\/rehabilitation-of-pipelines-at-valorsul\\\/\"},\"author\":{\"name\":\"Susana Guerreiro\",\"@id\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/#\\\/schema\\\/person\\\/76cd49f91ef96b6902453415264f0c55\"},\"headline\":\"Rehabilitation of Pipelines at Valorsul\",\"datePublished\":\"2024-09-06T11:07:38+00:00\",\"dateModified\":\"2024-09-10T11:19:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/2024\\\/09\\\/06\\\/rehabilitation-of-pipelines-at-valorsul\\\/\"},\"wordCount\":299,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/2024\\\/09\\\/06\\\/rehabilitation-of-pipelines-at-valorsul\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.ativ.pt\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/valosul_conduta_destaque.jpg\",\"articleSection\":[\"Article\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.ativ.pt\\\/en\\\/2024\\\/09\\\/06\\\/rehabilitation-of-pipelines-at-valorsul\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/2024\\\/09\\\/06\\\/rehabilitation-of-pipelines-at-valorsul\\\/\",\"url\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/2024\\\/09\\\/06\\\/rehabilitation-of-pipelines-at-valorsul\\\/\",\"name\":\"Rehabilitation of Pipelines at Valorsul - Mota-Engil ATIV\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/2024\\\/09\\\/06\\\/rehabilitation-of-pipelines-at-valorsul\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/2024\\\/09\\\/06\\\/rehabilitation-of-pipelines-at-valorsul\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.ativ.pt\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/valosul_conduta_destaque.jpg\",\"datePublished\":\"2024-09-06T11:07:38+00:00\",\"dateModified\":\"2024-09-10T11:19:40+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/2024\\\/09\\\/06\\\/rehabilitation-of-pipelines-at-valorsul\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.ativ.pt\\\/en\\\/2024\\\/09\\\/06\\\/rehabilitation-of-pipelines-at-valorsul\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/2024\\\/09\\\/06\\\/rehabilitation-of-pipelines-at-valorsul\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.ativ.pt\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/valosul_conduta_destaque.jpg\",\"contentUrl\":\"https:\\\/\\\/www.ativ.pt\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/valosul_conduta_destaque.jpg\",\"width\":1198,\"height\":470},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/2024\\\/09\\\/06\\\/rehabilitation-of-pipelines-at-valorsul\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Rehabilitation of Pipelines at Valorsul\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/\",\"name\":\"Mota-Engil ATIV\",\"description\":\"Asset Management and Maintenance\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/#organization\",\"name\":\"Mota-Engil ATIV\",\"url\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.ativ.pt\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/logo-ativ-cor-1.svg\",\"contentUrl\":\"https:\\\/\\\/www.ativ.pt\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/logo-ativ-cor-1.svg\",\"width\":250,\"height\":100,\"caption\":\"Mota-Engil ATIV\"},\"image\":{\"@id\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/MotaEngilATIV\\\/\",\"https:\\\/\\\/www.instagram.com\\\/mota_engil_ativ\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/motaengil-ativ\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.ativ.pt\\\/en\\\/#\\\/schema\\\/person\\\/76cd49f91ef96b6902453415264f0c55\",\"name\":\"Susana Guerreiro\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rehabilitation of Pipelines at Valorsul - Mota-Engil ATIV","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ativ.pt\/en\/2024\/09\/06\/rehabilitation-of-pipelines-at-valorsul\/","og_locale":"en_US","og_type":"article","og_title":"Rehabilitation of Pipelines at Valorsul - Mota-Engil ATIV","og_description":"The rehabilitation of the S admission pipelines of the cooling water circuit at the Urban Solid Waste Treatment Plant (USWTP) of Valorsul, S.A. is one of the major projects in Mota-Engil ATIV's portfolio.","og_url":"https:\/\/www.ativ.pt\/en\/2024\/09\/06\/rehabilitation-of-pipelines-at-valorsul\/","og_site_name":"Mota-Engil ATIV","article_publisher":"https:\/\/www.facebook.com\/MotaEngilATIV\/","article_published_time":"2024-09-06T11:07:38+00:00","article_modified_time":"2024-09-10T11:19:40+00:00","og_image":[{"width":1198,"height":470,"url":"https:\/\/www.ativ.pt\/wp-content\/uploads\/2024\/09\/valosul_conduta_destaque.jpg","type":"image\/jpeg"}],"author":"Susana Guerreiro","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Susana Guerreiro","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.ativ.pt\/en\/2024\/09\/06\/rehabilitation-of-pipelines-at-valorsul\/#article","isPartOf":{"@id":"https:\/\/www.ativ.pt\/en\/2024\/09\/06\/rehabilitation-of-pipelines-at-valorsul\/"},"author":{"name":"Susana Guerreiro","@id":"https:\/\/www.ativ.pt\/en\/#\/schema\/person\/76cd49f91ef96b6902453415264f0c55"},"headline":"Rehabilitation of Pipelines at Valorsul","datePublished":"2024-09-06T11:07:38+00:00","dateModified":"2024-09-10T11:19:40+00:00","mainEntityOfPage":{"@id":"https:\/\/www.ativ.pt\/en\/2024\/09\/06\/rehabilitation-of-pipelines-at-valorsul\/"},"wordCount":299,"commentCount":0,"publisher":{"@id":"https:\/\/www.ativ.pt\/en\/#organization"},"image":{"@id":"https:\/\/www.ativ.pt\/en\/2024\/09\/06\/rehabilitation-of-pipelines-at-valorsul\/#primaryimage"},"thumbnailUrl":"https:\/\/www.ativ.pt\/wp-content\/uploads\/2024\/09\/valosul_conduta_destaque.jpg","articleSection":["Article"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.ativ.pt\/en\/2024\/09\/06\/rehabilitation-of-pipelines-at-valorsul\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.ativ.pt\/en\/2024\/09\/06\/rehabilitation-of-pipelines-at-valorsul\/","url":"https:\/\/www.ativ.pt\/en\/2024\/09\/06\/rehabilitation-of-pipelines-at-valorsul\/","name":"Rehabilitation of Pipelines at Valorsul - Mota-Engil ATIV","isPartOf":{"@id":"https:\/\/www.ativ.pt\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.ativ.pt\/en\/2024\/09\/06\/rehabilitation-of-pipelines-at-valorsul\/#primaryimage"},"image":{"@id":"https:\/\/www.ativ.pt\/en\/2024\/09\/06\/rehabilitation-of-pipelines-at-valorsul\/#primaryimage"},"thumbnailUrl":"https:\/\/www.ativ.pt\/wp-content\/uploads\/2024\/09\/valosul_conduta_destaque.jpg","datePublished":"2024-09-06T11:07:38+00:00","dateModified":"2024-09-10T11:19:40+00:00","breadcrumb":{"@id":"https:\/\/www.ativ.pt\/en\/2024\/09\/06\/rehabilitation-of-pipelines-at-valorsul\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ativ.pt\/en\/2024\/09\/06\/rehabilitation-of-pipelines-at-valorsul\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.ativ.pt\/en\/2024\/09\/06\/rehabilitation-of-pipelines-at-valorsul\/#primaryimage","url":"https:\/\/www.ativ.pt\/wp-content\/uploads\/2024\/09\/valosul_conduta_destaque.jpg","contentUrl":"https:\/\/www.ativ.pt\/wp-content\/uploads\/2024\/09\/valosul_conduta_destaque.jpg","width":1198,"height":470},{"@type":"BreadcrumbList","@id":"https:\/\/www.ativ.pt\/en\/2024\/09\/06\/rehabilitation-of-pipelines-at-valorsul\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ativ.pt\/en\/"},{"@type":"ListItem","position":2,"name":"Rehabilitation of Pipelines at Valorsul"}]},{"@type":"WebSite","@id":"https:\/\/www.ativ.pt\/en\/#website","url":"https:\/\/www.ativ.pt\/en\/","name":"Mota-Engil ATIV","description":"Asset Management and Maintenance","publisher":{"@id":"https:\/\/www.ativ.pt\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ativ.pt\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.ativ.pt\/en\/#organization","name":"Mota-Engil ATIV","url":"https:\/\/www.ativ.pt\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.ativ.pt\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.ativ.pt\/wp-content\/uploads\/2022\/04\/logo-ativ-cor-1.svg","contentUrl":"https:\/\/www.ativ.pt\/wp-content\/uploads\/2022\/04\/logo-ativ-cor-1.svg","width":250,"height":100,"caption":"Mota-Engil ATIV"},"image":{"@id":"https:\/\/www.ativ.pt\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/MotaEngilATIV\/","https:\/\/www.instagram.com\/mota_engil_ativ\/","https:\/\/www.linkedin.com\/company\/motaengil-ativ"]},{"@type":"Person","@id":"https:\/\/www.ativ.pt\/en\/#\/schema\/person\/76cd49f91ef96b6902453415264f0c55","name":"Susana Guerreiro"}]}},"_links":{"self":[{"href":"https:\/\/www.ativ.pt\/en\/wp-json\/wp\/v2\/posts\/12063","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ativ.pt\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ativ.pt\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ativ.pt\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ativ.pt\/en\/wp-json\/wp\/v2\/comments?post=12063"}],"version-history":[{"count":2,"href":"https:\/\/www.ativ.pt\/en\/wp-json\/wp\/v2\/posts\/12063\/revisions"}],"predecessor-version":[{"id":12096,"href":"https:\/\/www.ativ.pt\/en\/wp-json\/wp\/v2\/posts\/12063\/revisions\/12096"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ativ.pt\/en\/wp-json\/wp\/v2\/media\/12057"}],"wp:attachment":[{"href":"https:\/\/www.ativ.pt\/en\/wp-json\/wp\/v2\/media?parent=12063"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ativ.pt\/en\/wp-json\/wp\/v2\/categories?post=12063"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ativ.pt\/en\/wp-json\/wp\/v2\/tags?post=12063"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}